英语听力汇总   |   新概念英语第三册逐句精讲语言点 第17课 世界上最长的吊桥 (3)

https://online1.tingclass.net/lesson/shi0529/

更新日期:2015-11-19浏览次数:1467次所属教程:新概念英语文章

-字号+

听力原文

  The platforms extend to a depth of over 100 feet under the sea. These alone took sixteen months to build. Above the surface of the water, the towers rise to a height of nearly 700 feet. They support the cables from which the bridge has been suspended.

  9. The platforms extend to a depth of over 100 feet under the sea.

  平台深入海底100英尺。

  语言点:句子结构分析:of over 100 feet under the sea是depth的后置定语。

  10. These alone took sixteen months to build.

  仅这两座塔就花了16个月才建成。

  语言点1:alone在此处是副词,意为“仅,单单”

  语言点2:take some time to do sth.的意思是“花费多少时间做某事”。

  11. Above the surface of the water, the towers rise to a height of nearly 700 feet.

  塔身高出水面将近700英尺。

  语言点:句子结构分析:above the surface of the water放在句首,充当地点状语。

  12. They support the cables from which the bridge has been suspended.

  高塔支撑着钢缆,而钢缆又悬吊着大桥。

  语言点:句子结构分析:which引导定语从句,修饰cables。From与从句中的has been suspended形成固定搭配,即suspend from,意思是“从…悬吊下来”。